›› 2011, Vol. 25 ›› Issue (4): 14-16.
Previous Articles Next Articles
SHI Xiang feng, HAN Yan fei, TAN Xiao
Received:
Online:
Published:
Abstract: There is high risk for settlement during mining construction of subway tunnel underpass buildings. Based on a project of Guangzhou subway tunnel, the risk and the corresponding control measures during the construction are introduced, then the treatment to the water leakage, the key factor for settlement, which can provide a reference for similar projects.
Key words: mining method tunnel, underpass buildings, foundation reinforcement, risk control
SHI Xiang feng, HAN Yan fei, TAN Xiao. Risk Control During Mine Construction of Subway Tunnel Underpass Buildings[J]. , 2011, 25(4): 14-16.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://tgjc.whrsm.ac.cn/EN/
https://tgjc.whrsm.ac.cn/EN/Y2011/V25/I4/14