Construction Techniques of Submerged Drilling for Cast-in-Place Piles at Yellow River Floodplains

HE Xiaojun   

  1. (Tongchuan Vocational and Technical College,Tongchuan Shanxi,727031)
  • Received:2012-10-21 Online:2013-08-20 Published:2013-08-27

Abstract: The construction sequence of a reinforced concrete castinpace pile is to open a hole at the proposed pile location, place the rebar cage into the hole and then place the concrete. This technique receives a wide application due to its relatively matured construction technique, reliable quality, low cost, high bearing capacity as well as applicable to a wide range of soil strata. This paper presents a case study of the installation of castinpace piles for a pipeline project in Yellow River Floodplains. The construction results of the submerged reinforced castinplace concrete piles in these soil strata are also introduced.

Key words: Cast-in-Place Piles, Submerged Drilling, Floodplains, Construction Control