Abstract: The construction method for lifting rebar cage for diaphragm wall for a metro station is presented in as case study. The selection of crane, lifting capacity estimation, the locations of pick points and proper construction procedure are presented in this paper.
Key words: Diaphragm Wall, Rebar Cage, Pick Point