›› 2011, Vol. 25 ›› Issue (5): 20-22.
Previous Articles Next Articles
LU Guan hong, ZENG Qing jun, HUANG Min, XIAO Fang
Received:
Online:
Published:
Abstract: In a case study of the foundation rehabilitation of a high\|raised building, small diameter (Φ=150 mm) boreholes were drilled through the mat foundation. These boreholes were expanded into large diameter (Φ=400 mm) cast\|in\|situ concrete piles by utilizing the soil anchor borehole enlargement techniques. This method has the advantages of minimizing the existing foundation damage; controllable pile diameter; reliable single pile capacity; and fast construction. The case study suggests this method has good foundation improvement results.
LU Guan hong, ZENG Qing jun, HUANG Min, XIAO Fang. Applications of Soil Anchor Borehole Enlargement Techniques in the Foundation Rehabilitation of a High-raised Building[J]. , 2011, 25(5): 20-22.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://tgjc.whrsm.ac.cn/EN/
https://tgjc.whrsm.ac.cn/EN/Y2011/V25/I5/20