Abstract: For the excavation of garage foundation, its excavated depth is no less than 6.0 m and the distance between the excavation and the existing building is just 0.3 m. The crack in the building nearby is caused if the normal construction method is accepted, therefore the combination of advanced I\|steel pile with soil nail is adopted, the construction procedure is adjusted, which is successfully for the deformation control and the stability of around buildings.
CHEN Yi quan1, LI Xing yuan2. Application of Advanced I-steel Pile in Excavation Retaining[J]. , 2011, 25(4): 11-13.