›› 2014, Vol. 28 ›› Issue (1): 50-52.
Previous Articles Next Articles
LI Hongwei, LIU Biyan
Received:
Online:
Published:
Abstract: This paper discusses common factors that causing the honeycomb and excessive dimension acceptance in the mass concrete pouring project. These aspects include: selecting of construction materials and equipment, qualification of labors, climate during the construction, concrete pouring control and curing. Methods that can improve the concrete pouring quality are also proposed.
Key words: mass concrete pour, appearance quality, construction procedures
LI Hongwei, LIU Biyan. Techniques of Improving the Quality of Mass Concrete Pouring[J]. , 2014, 28(1): 50-52.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://tgjc.whrsm.ac.cn/EN/
https://tgjc.whrsm.ac.cn/EN/Y2014/V28/I1/50