›› 2011, Vol. 25 ›› Issue (3): 94-.
Previous Articles
WANG Jian hua1, WANG Geng2, ZHANG Mao jun3
Received:
Online:
Published:
Abstract: The engineering geological condition and evaluation of dam site is the key in the survey of Maojiehe hydropower station construction, which plays an important role for its security, construction period and cost.
WANG Jian hua1, WANG Geng2, ZHANG Mao jun3. Dam Site Engineering Geological Evaluation in Hydropower Station[J]. , 2011, 25(3): 94-.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://tgjc.whrsm.ac.cn/EN/
https://tgjc.whrsm.ac.cn/EN/Y2011/V25/I3/94