The Design and Practice of Foundation Pit Engineering Combining the Top-down Method for the Annex Building and Ordinary Excavation Method for Main Building
DI Guoen1,2
(1.East China Architecture Design & Research Institute Co., Ltd., Shanghai Underground Space & Engineering Design Institute, Shanghai 200011; 2.Shanghai Engineering Research Center of Safety Control for Facilities Adjacent to Deep Excavations,Shanghai 200011)
DI Guoen, . The Design and Practice of Foundation Pit Engineering Combining the Top-down Method for the Annex Building and Ordinary Excavation Method for Main Building[J]. Soil Engineering and Foundation, 2020, 34(2): 145-151.