›› 2015, Vol. 29 ›› Issue (5): 46-49.

Previous Articles     Next Articles

Reservoir Dam Stability Evaluation Method based on Fuzzy Risk Analysis

LIU Baochen1,2, YANG Bai2, ZHANG Binghui2, XIE Yanhua3, ZHANG Chenfu2   

  1. (1.Guangxi Key Laboratory of Geomechanics and Geotechnical Engineering, Guilin, 541004;
    2.College of Civil Engineering, Guilin University of Technology, Guilin, 541004;
    3.Guangxi Urban Construction School, Guilin 541004;)
  • Received:2014-09-17 Online:2015-10-20 Published:2015-11-06

Abstract: The stability of a reservoir dam is evaluated by using fuzzy risk analysis method. The uncertainty and the fuzziness of the traditional dam stability evaluation methods are improved by using the fuzzy system and fuzzy theories. In the Muyezhai Reservoir Dam stability evaluation case history project, the fuzzy risk analysis method is implemented and it is proved to be applicable.

Key words: Risk, Fuzzy Analysis, Reservoir Dam, Stability Evaluation