›› 2014, Vol. 28 ›› Issue (1): 21-25.

Previous Articles     Next Articles

Design and Construction of a Shallow Buried Subway Undercrosss a Large Box Culvert

HE Xiaolong   

  1. (Engineering Design and Investigation Institute, China Railway 17th Bureau Group Co., Ltd. Taiyuan, 030006)
  • Received:2013-05-21 Online:2014-02-20 Published:2014-02-27

Abstract: This paper presents a case study of the Central Subway for the Island Loop and Convention Center of Xiamen City. The design and construction aspects of a shallow buried subway under crossing a large box culvert are discussed.

Key words: urban subway, small net distance, box culverts, design