Abstract: The blasting program, parameter selection, blasting network and security measures of the cutoff wall demolition project of downstream transverse earthrock cofferdam in the secondstage project in Xiangjiaba Hydropower Station are introduced. The quality and safety control difficulty of flyrock from cutoff wall blasting was increased on account of the excavation of rockfill materials upstream. We ensured the quality and safety of the blasting construction by means of the strict implementation of the blasting program.
Key words: hydropower station, cofferdam, cutoff wall, demolition blasting
LIU Kan1,PEI Weixing2,LIU Tao3,LI Mingsong1,XIAO Qingsong1 . Blasting Demolition of Cutoff Wall for a Downstream Transverse Earth-Rock Cofferdam in Second Phase Construction of Xiangjiaba Hydropower Station[J]. , 2013, 27(4): 17-19.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://tgjc.whrsm.ac.cn/EN/
https://tgjc.whrsm.ac.cn/EN/Y2013/V27/I4/17