›› 2012, Vol. 26 ›› Issue (6): 70-72.

Previous Articles     Next Articles

FLAC3DAnalyses of Anchored Soldier Pile and Lagging Combined with Soil Nailed Walls

HOU Huijin1, LIANG Zhenxi1, WANG Baoshi1   

  1. (1.College of Civil Engineering, Hebei University of Engineering, Handan  Hebei 056038;
    2.Xingtai City Highway Engineering Management Bureau, Xingtai Hebei  054000)
  • Received:2012-04-05 Online:2012-12-20 Published:2012-12-25

Abstract: This paper presents a case history of numerical analysis of an anchored soldier pile and lagging combined with soil nailed wall for the support of a deep excavation by using FLAC3D. The numerical analysis results have been verified by an actual construction project.

Key words: FLAC3D, Deep Excavation, Supporting by Soil Nail and Anchored Soldier Pile Lagging Wall