›› 2011, Vol. 25 ›› Issue (4): 5-7.

Previous Articles     Next Articles

Construction Technique of CFG Pile in Saline Soil of Luyanghu

FANG  Yun1, MA  Biao2, LUO  Jian  hua1   

  1. (1. Shanxi Professional Institute of Railway Engineering Technology, Weinan   Shanxi 714000; 2. Highway School, Chang'an University, Xi'an 710064, China)
  • Received:2011-05-09 Online:2011-08-20 Published:2011-11-23

Abstract: Aimed to solve the saline soil ground during the highway construction in Luyanhu development zone, Shanxi Province. according to its basic property by tests, the comprehensive treatment of dewatering, CFG pile and immersed salty is used. By monitoring of the whole construction process, its basic procedure, construction mixture ratio control, quality testing and control measurement in saline soil region are summarized, which is provided as the reference for similar engineering.