›› 2011, Vol. 25 ›› Issue (3): 84-.

Previous Articles     Next Articles

Identification and Interpretation of Electrical Geophysical Prospecting for Karst Roadbed in Xiangcheng Section of Hangzhou-Changsha Passenger Dedicated Railway

CHEN  De  ping   

  1. (Geology and Roadbed Division, China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, China)
  • Received:2011-03-22 Online:2011-11-15 Published:2012-01-13

Abstract: The influence factors of karst development in Xiangcheng section of the passenger dedicated railway from Hangzhou to Changsha was analyzed systematically. By researching on the rule of electrical relative change of different lithology and combining with the cross section of electrical geophysical prospecting, the developed position and developing scale of karst in Xiangcheng section was studied. In the end, based on the engineering drilling data, the accuracy of electrical geophysical prospecting was verified.