Construction and Safety Assessments of the Wuhan Guishan TV Tower Foundation

LI Qiannan1, WANG Ping2, ZHANG Li2, SHI Lingyi3   

  1. (1.Wuhan Research Institute of Metallurgical Construction, Wuhan 430081;2.China First Metallurgical group Co., Ltd. Wuhan 430081;
    3.Hubei Wuchang Experimental High School,Wuhan 430060)
  • Received:2018-01-17 Revised:2018-01-22 Online:2018-06-22 Published:2018-06-26

Abstract: The foundation construction aspects of Wuhan Guishan TV tower are introduced in this paper. The sequence and key steps in the base pedestal construction are demonstrated in detail. The stability of the tower under the strong wind load conditions are also checked.

Key words: TV Tower, Pedestal Foundation, Construction, Safety