Application of Trench Cutting and Re-Mixing Method in Urban Transit Projects

JIANG Ying1, HE Zhenhua1, LIU Hua1, HUANG Wei2   

  1. (1.Central and Southern China Municipal Design & Research Institute Co., Ltd., Wuhan 430010;
    2.China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430023)
  • Received:2017-12-22 Revised:2018-01-02 Online:2018-06-22 Published:2018-06-26

Abstract: The open cut excavation has been frequently used in the rail transit projects as a commonly applied construction method due to it fast construction and applicability to a wide variety of geological conditions. As a supporting structure for the open cut excavation, the TrenchCutting& Remixing Deep (TRD) Wall Method has the advantages over other conventional excavation supporting methods, such as, slurry wall, SoilCement Mixing Wall (SMW), and tangent pile castinplace concrete pile wall. This paper presents a case history of the transit excavation project in the regional light rail S1 Line in Wenzhou. All four excavation supporting construction methods were compared. It was concluded that the TRD method is applicable to the thick soft soil strata and this method has the advantage of reliable, cost effective and fast construction.

Key words: Pile Formed by TRD Method, Soil-Cement Mixing Column with Hot-Rolled Steel Inclusion Wall, Rail Transit, SMW Columns, Slurry Wall