›› 2016, Vol. 30 ›› Issue (3): 362-364.

Previous Articles     Next Articles

Driving Criteria for Prefabricated Reinforced Concrete Square Piles

WANG Wei1,2,3, LIU Jingjing1,3, SONG Pengbo1, HAO Yanpeng1, ZHENG Yunfeng1,3, QIAO Yongli1   

  1. (1.Hebei Research Institute of Construction and Geotechnical Investigation Co. Ltd., Shijiazhuang 050031;
    2.School of Civil Engineering, Beijing Jiaotong University. Beijing 100044;
    3.Technology Center of Geotechnical Engineering of Hebei Province, Shijiazhuang 050031)
  • Received:2016-01-31 Revised:2016-02-25 Online:2016-06-20 Published:2016-06-21

Abstract: In the installation of prefabricated reinforced concrete square pile practice, the driving criteria are usually primarily controlled by the tip elevation and the pile penetration rates are the secondary indices. In the practical engineering, due to the over emphasis of the total penetration length and the elevation, the pile heads are usually cracked and piles might be damaged. This project presents a penetration control formula based on the Hiley Approach. The WEAP analysis was performed and the results were satisfactory.

Key words: Prefabricated Reinforced Concrete Square Piles, Driving Criteria, Pile Penetration Rate, Dynamic Formula