Analysis and Remediation for Cracking of Sidewalls of Open-excavated Underway Tunnel

LIU Zhigang1,2, LI Zhihong1,2   

  1. (1.Guangdong Nanyue Transportation Investment & Construction Co., Ltd., Guangzhou 510101;
    2.The Management Center of Zhuhai Link Road of Hong KongZhuhaiMacao Bridge, Zhuhai 519030)
  • Received:2016-04-08 Revised:2016-04-16 Online:2016-06-20 Published:2016-06-21

Abstract: The cracking on the concrete sidewalls of cut and cover tunnels, very long subway stations and very deep basements of building is always one of the frequently occurred issues during the construction. This paper discusses factors that causing cracks on the sidewalls. The case history of different measures on controlling cracks on a cut and cover tunnel are presented and the results are compared. Cracking mitigation methods are also recommended.

Key words: Cut and Cover Tunnel, Sidewall, Cracking, Factors Causing Cracks, Mitigation