Soil Engineering and Foundation ›› 2021, Vol. 35 ›› Issue (3): 417-420.
Previous Articles
XIONG Yi
Received:
Revised:
Online:
Published:
Abstract: In order to ensure the construction safety of a high slope of Chashan Highway and Yangxi Avenue Interchange Project in Gaoming District of Foshan City, this paper establishes a comprehensive monitoring system for the high cut slope on the left side between Station K9+065 and Station K9+216. Throughout the monitoring results, the magnitude, pattern and trend of the cut slope can be systematically understood. The monitoring results show that: 1) the daily change of individual monitoring points might exceed the alarm value, but the entire monitoring data were relatively normal on the whole; 2) The slope was in a stable state, and no obvious cracks and deformation were observed on the surface of the monitored slope.
Key words: High Slope, Integrated Monitoring System, Slope Deformation, Stability
CLC Number:
P642
XIONG Yi. Stability Monitoring of a High Slope of Chashan Highway and Yangxi Avenue Interchange[J]. Soil Engineering and Foundation, 2021, 35(3): 417-420.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://tgjc.whrsm.ac.cn/EN/
https://tgjc.whrsm.ac.cn/EN/Y2021/V35/I3/417