Soil Engineering and Foundation ›› 2020, Vol. 34 ›› Issue (1): 4-08.
Previous Articles Next Articles
ZHANG Dewen1, WEI Qingwen1, HUANG Xing2
Received:
Revised:
Online:
Published:
Abstract: This paper is based on the experience when excavating the waterrich karst stratum of the limestone section in the Jinan Metro R1 Line from Fengjing Station to Dayang Station. The application background, basic principle, main process and key technology for the pressurized chamber inspection using shield protection mud are introduced in details. By analyzing the experience for operation control, cutter selection, soil improvement, cutter replacement and equipment maintenance, some recommendations are proposed. This paper helps to solve the highrisk problems for the safe pressured chamber inspection and the effective cutter replacement in highly jointed/fractured and waterrich karst stratums.
Key words: Shield Protection Slurry, Pressurized Chamber Inspection, Karst Terrain, Fractured Rock Mass, Cutter Replacement
CLC Number:
U455
ZHANG Dewen, WEI Qingwen, HUANG Xing. Pressurized Chamber Inspection and Cutter Replacement with Shield Protection Slurry in Saturated Karst Terrain[J]. Soil Engineering and Foundation, 2020, 34(1): 4-08.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://tgjc.whrsm.ac.cn/EN/
https://tgjc.whrsm.ac.cn/EN/Y2020/V34/I1/4