›› 2017, Vol. 31 ›› Issue (6): 667-669.
Previous Articles Next Articles
WANG Junrong1, YIN Jianguang2
Received:
Revised:
Online:
Published:
Abstract: The construction quality of the engineering is frequently defective. If these flawed elements are completely rejected and reconstructed, it is usually associated with large construction cost increase and delayed schedule. In the reinforced concrete bored pile in soft soil, it is especially difficult for the reconstruction of a new bored pile at the original location. This paper presents a case study of the remediation of a defective reinforced concrete bored pile. The constructible, reliable, safe and cost effective solutions have also proposed. \=
Key words: Piled Foundation, Thick Pile Caps, Soil Movements
WANG Junrong1, YIN Jianguang2. A Cause Study of the Remediation of an OffAligned Viaduct Pier[J]. , 2017, 31(6): 667-669.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://tgjc.whrsm.ac.cn/EN/
https://tgjc.whrsm.ac.cn/EN/Y2017/V31/I6/667