›› 2015, Vol. 29 ›› Issue (3): 96-99.

Previous Articles     Next Articles

Construction of a Three-Story Subway Transfer Center by Using Deep Excavation Supporting Method for the Two-Story Subway Station

XIONG Zhu   

  1. (China Railway Siyuan Survey and Design Group C., .Ltd.,Wuhan, 430063)
  • Received:2015-04-09 Online:2015-06-20 Published:2015-06-26

Abstract: A threestory subway transfer junction is constructed underneath the main intersection of the city's main streets in the high groundwater area. The supporting structure is the same structure for the two story station deep excavation. The segmental strip excavation was used during the construction without increase the depth of the existing supporting structure. This paper presents the design and construction considerations.  

Key words: Deep Excavation Supporting, Technical Considerations, Construction Techniques, Transfer Junctions