›› 2014, Vol. 28 ›› Issue (4): 44-47.
Previous Articles Next Articles
ZANG Hongmin1, LI Shuchen2, MA Tengfei2, ZHANG Luchen2, WANG Shulei3
Received:
Online:
Published:
Abstract: The excessively high geothermal temperature in a water diversion tunnel of Niangyong Hydraulic Electricity Generation Station resulted in serious construction difficulties: the surface temperature of rock mass after the blasting reached 75 degrees Celsius; the highest water rushed in the tunnel was 82 degrees Celsius; the ambient temperature in the tunnel was 53 degrees Celsius. A temperature reduction system through the ventilation was established and the temperature in the tunnel was able to be reached to 30 degrees Celsius. A safe and comfortable tunnel excavation condition could be developed under the excessively high geothermal conditions.
Key words: Water Diversion Tunnels, Excessive High Geo-thermal Conditions, Temperature Reduction Measures, Construction Technique
ZANG Hongmin1, LI Shuchen2, MA Tengfei2, ZHANG Luchen2, WANG Shulei3. Construction of a Long Water Diversion Tunnel under High Geo-thermal Temperature Conditions[J]. , 2014, 28(4): 44-47.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://tgjc.whrsm.ac.cn/EN/
https://tgjc.whrsm.ac.cn/EN/Y2014/V28/I4/44