›› 2013, Vol. 27 ›› Issue (3): 104-107.
Previous Articles Next Articles
He wen hua1, Li wei zhong2
Received:
Online:
Published:
Abstract: Due to the complicated engineering geological conditions along the metro line 2 in wuhan, , a lot of geotechnical engineering problems occuered in in the route reconnaissance, design and construction. The main geotechnical problems such as soft soil, newly despoited soil , groundwater, krast based on the detailed engineering geological conditions, and summarize the reasonable measures to solve these problems, which could provide certain reference for future similar construction.
Key words: soft soil, newly despoited soil, groundwater, krast
He wen hua1, Li wei zhong2. Research on The Geotechnical Problems Of Metro Line 2 In Wuhan City[J]. , 2013, 27(3): 104-107.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://tgjc.whrsm.ac.cn/EN/
https://tgjc.whrsm.ac.cn/EN/Y2013/V27/I3/104