›› 2012, Vol. 26 ›› Issue (1): 5-8.
Previous Articles Next Articles
FU Min
Received:
Online:
Published:
Abstract: This paper presents a design and construction case history of replacing soft muck soils with controlled blasting method during the construction of Eastern Revetment of Ningde Nuclear Power Plant. The project practice indicates that this method is reliable and can meet the requirement of both construction schedule and the cost control without compromising the engineering quality requirements.
Key words: replacing muck by controlled blasting, controlled blasting techniques, construction technique
FU Min. Application of Replacing Muck by Controlled Blasting in the Revetment Construction[J]. , 2012, 26(1): 5-8.