Final Settlement Method of Subgrade

CHEN  Zhi  hui   

  1. (Consulting Company, China Railway SIYUAN Survey and Design Group Co., Ltd., Wuhan 430063, China)
  • Received:2010-08-17 Online:2011-02-20 Published:2014-06-27

Abstract: There were many methods to calculate the final settlement of subgrade embankment according to the settlement monitoring result. The graphical hyperbolic method and improved hyperbolic method was introduced, then the consolidation degree of foundation was also calculated. The above discussed method was used in the engineering, its result was compared with the result calculated by the logarithmic method and the expotential curve method, there was no obvious difference among them by comparison.