浅埋暗挖隧道地层沉降控制措施研究

周沈华1,宋再荣2,吴海山2   

  1. (1.西安市地下铁道有限责任公司,西安 710018;2.中铁一局集团有限公司,西安 710054)
  • 收稿日期:2014-03-20 出版日期:2015-02-20 发布日期:2015-03-13
  • 作者简介:周沈华(1980-),男,硕士研究生,工程师,主要研究方向为岩土工程。

Ground Subsidence Control of a Shallow-Buried Tunnel

ZHOU Shenhua1, SONG Zairong2, WU Haishan2   

  1. (1. Xi′an Underground Railway Co., Ltd., Xi′an 710018;
    2. China Railway First Bureau Group Co., Ltd., Xi′an 710054)
  • Received:2014-03-20 Online:2015-02-20 Published:2015-03-13

摘要: 对西安地铁1号线西咸车辆段出入段线双连拱浅埋暗挖隧道地层沉降影响因素进行了分析,研究了超前小导管注浆及径向注浆加固在控制地层沉降中的作用,表明在特殊区段采取土体局部加固措施是必要的。

关键词: 浅埋暗挖法, 地层沉降, 径向注浆

Abstract: The impact factors of the construction of apron sections of the doublearch shallow buried metro tunnel at the Xixian Station in Xi′an Metro Project on the subsidence of the ground surface are discussed in this paper. The roles of the small leadtube advanced grouting in the ground subsidence control are also presented. The project practice indicates that it is necessary to strengthening the soil at some special areas.

Key words: ShallowBuried Tunnels, Ground Subsidence, Radial Grouting