摘要: 对西安地铁1号线西咸车辆段出入段线双连拱浅埋暗挖隧道地层沉降影响因素进行了分析,研究了超前小导管注浆及径向注浆加固在控制地层沉降中的作用,表明在特殊区段采取土体局部加固措施是必要的。
关键词: 浅埋暗挖法, 地层沉降, 径向注浆
Abstract: The impact factors of the construction of apron sections of the doublearch shallow buried metro tunnel at the Xixian Station in Xi′an Metro Project on the subsidence of the ground surface are discussed in this paper. The roles of the small leadtube advanced grouting in the ground subsidence control are also presented. The project practice indicates that it is necessary to strengthening the soil at some special areas.
Key words: ShallowBuried Tunnels, Ground Subsidence, Radial Grouting
周沈华1,宋再荣2,吴海山2. 浅埋暗挖隧道地层沉降控制措施研究[J]. , 2015, 29(1): 66-69.
ZHOU Shenhua1, SONG Zairong2, WU Haishan2. Ground Subsidence Control of a Shallow-Buried Tunnel[J]. , 2015, 29(1): 66-69.