土工基础 ›› 2025, Vol. 39 ›› Issue (6): 866-872.

• 工程实录 • 上一篇    下一篇

MJS工法在管廊基坑支护穿越大直径管群中的应用

蔡清1,和礼红2,高增奎3   

  1. (1.武汉设计咨询集团有限公司,武汉 430022;2.武汉市政工程设计研究院有限责任公司,武汉 430023;3.中铁七局集团武汉工程有限公司,武汉 430074)
  • 收稿日期:2024-12-02 修回日期:2024-12-18 出版日期:2025-12-31 发布日期:2026-01-31
  • 作者简介:蔡清(1986-),男,硕士,高级工程师,研究方向为岩土工程。

Key Technologies and Practices for Deep Excavation Support of Large-Diameter Pipe Groups Crossing the Utility Tunnels Using MJS Method

CAI Qing1, HE Lihong2, GAO Zengkui3   

  1. (1.Wuhan Design & Consulting Group Co. Ltd., Wuhan 430022;
    2.Wuhan Municipal Engineering Design & Research Institute Co. Ltd., Wuhan 430023;
    3.Wuhan Engineering Co. Ltd., China Railway Seventh Group, Wuhan 430074)
  • Received:2024-12-02 Revised:2024-12-18 Online:2025-12-31 Published:2026-01-31

摘要: 结合某综合管廊基坑工程实例,详细介绍了管廊与三根既有管道相交段基坑的概况、周边环境、工程地质条件、水文地质条件等。为确保管廊基坑穿越大直径管群时的基坑侧壁土体稳定及管道安全,该段基坑采用钻孔灌注桩+内支撑+MJS侧壁土体加固+MJS封底的支护措施,系统介绍了支护方案的设计思路、设计内容、施工工艺流程及施工要求等。通过工程实施情况及监测结果表明,通过采取该支护方案可以保证管廊基坑的安全和既有管道的正常运营,解决了大直径管群横穿管廊基坑支护结构难以封闭的技术难题,支护方案相对矩形顶管穿越既有管道方案缩短了工期,节约了造价,具有良好的社会及经济效益。

关键词: MJS工法, 大直径管群, 横穿管廊, 基坑支护

Abstract: Combined with the example of a deep excavation of a comprehensive utility tunnel, this paper introduces in detail the general conditions, surrounding environment, engineering geological and hydrogeological conditions of the foundation excavation at the intersection section of the utility tunnel and three existing pipelines. To ensure the stability of the soil on the side walls of the deep excavation and the safety of pipelines when the deep excavation of the utility tunnel crosses a large-diameter pipe group, the support measures of bored cast-in-place piles + internal supports + Metro Jet System (MJS) sidewall soil reinforcement + MJS bottom sealing are adopted for this section of the deep excavation. This paper systematically introduces the design ideas, design contents, construction process flows and construction requirements of the support options. The implementation of the project and the monitoring results show that by adopting this support plan, the safety of the deep excavation of the utility tunnel and the normal operation of the existing pipelines can be ensured, the technical problem that it is difficult to close the support structure when a large-diameter pipe group crosses the deep excavation of the utility tunnel can be solved. Compared with the option of rectangular pipe jacking crossing existing pipelines, the support plan shortens the construction period, saves costs and has good social and economic benefits.

Key words: Metro Jet System (MJS) Construction Method, Large-Diameter Pipe Groups, Crossing Pipe Gallery, Deep Excavation Support

中图分类号: