Metro Construction Using Shielded Tunneling in Unweathered Granite Boulder Zones

HUANG Liping   

  1. Shenzhen Metro Group Ltd, Shenzhen, 518026
  • Received:2011-12-21 Online:2012-08-20 Published:2012-09-07

摘要: 根据深圳地区地铁盾构法隧道的施工实践,探讨了盾构施工遇花岗岩风化球处理的对策及关键技术。

关键词: 盾构施工, 花岗岩风化球, 对策

Abstract: This case history introduces the typical construction practice of shielded tunneling in Shenzhen. The construction means and methods of shielded tunneling in unweathered boulder zones of granite formations are discussed.

Key words: Shielded Tunneling, Unweathered Granite Boulders, Construction Means and Methods