土工基础 ›› 2026, Vol. 40 ›› Issue (4): 655-658.

• 专题论述 • 上一篇    下一篇

超大顶管穿越湖相地层有效覆土厚度计算研究

吕锦刚1,吴立鹏1,秦亚琼1,刘 杰2   

  1. (1.武汉市政工程设计研究院有限责任公司,武汉 430023;2.中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉 430071)
  • 收稿日期:2024-07-02 修回日期:2024-07-10 出版日期:2026-08-30 发布日期:2026-08-26
  • 作者简介:吕锦刚(1978-),男,正高级工程师,研究方向为非开挖施工技术。

Mechanical and Deformation Mechanisms of a Large Diameter Jacked Pipe Structure Deflection

LV Jingang1, WU Lipeng1, QIN Yaqiong1, LIU Jie2   

  1. (1.Wuhan Municipal Engineering Design and Research Institute Co. Ltd., Wuhan 430023;
    2.State Key Laboratory for Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Science, Wuhan 430071)
  • Received:2024-07-02 Revised:2024-07-10 Online:2026-08-30 Published:2026-08-26

摘要: 水下顶管覆盖层厚度存在一个有效范围,可以保证水下顶管施工中不易发生上浮、偏转等影响顶管结构稳定的工程问题。因此,确定一个合理的顶管覆盖层厚度是确保顶管施工安全的前提。基于武汉汤逊湖水下顶管工程,开展了湖下地层顶管施工有效覆盖层厚度的数值计算分析,获得顶管穿越湖相地层有效覆土厚度的范围及阈值。结果表明:当顶管上覆土层厚度较小时,顶管以及上部土体均产生较大的上浮和隆起,随着深度增加,顶管上部土体逐渐转为沉降变形,但后期上部土体的沉降变形及下部土体的上浮变形均逐渐减弱。汤逊湖顶管覆盖层厚度在8 m~15 m内可以成为湖下顶管有效覆土厚度的选择范围,当顶管深度达到15 m以后,顶管管顶、管底位移随着覆盖层厚度的增加变化不大,但覆盖层越厚,顶管施工难度、成本、工期都会有较大的增加,15 m是覆盖层厚度的阈值。

关键词: 顶管, 有效覆盖层厚度, 上浮, 湖相地层, 阈值

Abstract: A finite effective range of soil cover thickness exists for underwater pipe-jacking, within which construction issues such as uplift or lateral deviation—detrimental to pipe stability—can be effectively avoided. Establishing an appropriate cover thickness is therefore fundamental to ensuring construction safety. Using the Tangxun Lake underwater pipe-jacking project in Wuhan as a case study, numerical analyses were performed to evaluate the effective cover thickness for pipe-jacking through lacustrine deposits. The analyses identified both the applicable range and the threshold value of effective soil cover. The results show that when the soil cover above the pipe is insufficient, pronounced uplift occurs in both the pipe and the overlying soil mass. With increasing burial depth, the deformation of the upper soil transitions from uplift to settlement. At greater depths, both the settlement of the upper soil and the uplift of the lower soil gradually diminish. For the Tangxun Lake project, a cover thickness of 8~15 m constitutes an effective range for underwater pipe-jacking. When the pipe depth reaches 15 m, further increases in cover thickness produce only marginal reductions in crown and invert displacements. However, additional cover substantially increases construction difficulty, cost, and duration. Accordingly, 15 m can be regarded as the threshold cover thickness.

Key words: Pipe Jacking, Effective Cover Layer Thickness, Uplift, Lacustrine Strata, Threshold Value