土工基础 ›› 2026, Vol. 40 ›› Issue (4): 659-662.

• 专题论述 • 上一篇    下一篇

管道沟槽无支护开挖对临近桥墩的影响分析

沈青松,彭 赵,陈光法   

  1. (中国电建集团华东勘测设计研究院有限公司,杭州 311100)
  • 收稿日期:2024-06-21 修回日期:2024-07-10 出版日期:2026-08-30 发布日期:2026-08-26
  • 作者简介:沈青松(1996-),男,博士,工程师,研究方向为给排水管线施工技术。

Impact of Pipeline Trench Excavation on Adjacent Bridge Piers under Unsupported Conditions

SHEN Qingsong, PENG Zhao, CHEN Guangfa   

  • Received:2024-06-21 Revised:2024-07-10 Online:2026-08-30 Published:2026-08-26

摘要: 给排水管道在施工过程中不可避免地会穿越各种构筑物,设计人员通常会施加各种支护措施来减少管道沟槽施工对临近构筑物的影响。对于几十公里的管道工程,该方式将极大地增加施工成本,因此,分析无支护条件下的沟槽开挖影响显得尤为重要。基于江南水厂改扩建工程中配水管道横穿富阳大桥桥墩标段,通过数值模拟的方式进行研究。结果表明:管道沟槽开挖面安全稳定性系数在1.3左右,最小值为1.289;无支护开挖施工导致的桥墩周围土体位移小于3 mm,桥墩应力变化值小于3 kPa;内侧桥墩处的地表位移相较于外侧桥墩会小1~2 mm,应力变化量会1~2 kPa。

关键词: 管道沟槽, 施工影响, 明挖法, 无支护开挖

Abstract: During pipeline construction, water-supply and drainage conduits inevitably intersect existing structures. Although temporary support measures are commonly adopted to mitigate the influence of trench excavation on adjacent facilities, such measures can significantly increase construction costs for long-distance pipeline projects extending tens of kilometers. Assessing the excavation-induced response under unsupported conditions is therefore of practical importance. This study examines the section of the Jiangnan Water Plant expansion project where a distribution pipeline crosses the pier foundation of the Fuyang Bridge. Numerical analyses were performed to evaluate the stability of the trench face and the deformation response of the bridge pier. The results show that the safety factor of the excavation face remains approximately 1.3, with a minimum value of 1.289. Unsupported excavation induces soil displacements of less than 3 mm around the pier, and the corresponding stress variations are below 3 kPa. Surface displacement at the inner pier is 1~2 mm smaller than that at the outer pier, and the associated stress change is likewise 1~2 kPa lower. These findings indicate that, for the studied geological and structural conditions, unsupported trench excavation produces limited deformation and stress disturbance to the bridge pier, providing a quantitative reference for similar pipeline-crossing scenarios.

Key words: Pipeline Trench, Construction Impact, Cut and Cover Method, Unsupported Excavation

中图分类号: