土工基础 ›› 2026, Vol. 40 ›› Issue (3): 445-450.

• 工程实录 • 上一篇    下一篇

卵石及红砂岩组合地层中深大基坑设计对策

谈永卫1,2,邸国恩1,2   

  1. (1.华东建筑设计研究院有限公司上海地下空间与工程设计研究院,上海 200011;2.上海基坑工程环境安全控制工程技术研究中心,上海 200011)
  • 收稿日期:2025-11-10 修回日期:2025-11-21 出版日期:2026-06-30 发布日期:2026-06-25
  • 作者简介:谈永卫(1983-),男,高级工程师,硕士,研究方向为基坑工程等。

A Deep Excavation Support Design in Pebble and Red Sandstone Combined Strata

TAN Yongwei1,2, DI Guoen1,2   

  1. (1.East China Architecture Design & Research Institute Co. Ltd., Shanghai Underground Space & Engineering Design Institute Co. Ltd., Shanghai 200011;2.Shanghai Engineering Research Center of Safety Control for Facilities Adjacent to Deep Excavations, Shanghai 200011)
  • Received:2025-11-10 Revised:2025-11-21 Online:2026-06-30 Published:2026-06-25

摘要: 基于兰州地区大粒径富水卵石层和第三系半成岩红砂岩上下组合的地层条件,以背景工程为例,系统性的分析了红砂岩遇水软化、卵石层富水且粒径大等不良特性对基坑支护选型、地下水控制、环境保护的影响,并针对相关关键技术问题研究提出了设计对策。通过现场试验参数优化,验证了地下连续墙在该地层的适用性,解决了围护选型问题;研究采用了两道116 m超大直径圆环支撑体系,规避了锚拉体系施工对坑外红砂岩的扰动问题;采用分层降水等以“防”为主的系统性降水措施,解决了红砂岩降水困难、天然地基保护的问题。

关键词: 卵石层, 红砂岩, 深基坑, 地下连续墙, 圆环支撑, 系统性降水

Abstract: The geological conditions in the Lanzhou area are defined by a complex combination of large-particle, water-rich pebble strata and Tertiary hypabyssal red sandstone. A systematic evaluation was carried out to understand how the unfavorable characteristics of these formations-particularly the water-softening susceptibility of red sandstone and the high permeability and coarse particle size of cobble layers-affect support-system selection, groundwater control, and environmental protection. Corresponding engineering strategies were then developed to address these key technical challenges. Based on in-situ testing, a diaphragm wall was used for the first time in this region’s complex pebble strata. To prevent the traditional anchorage system from softening or disturbing the intact red sandstone outside the deep excavation, two 116 meter super-diameter ring bracing systems were implemented. A comprehensive groundwater-control scheme-centered on preventive, layered dewatering-effectively resolved issues related to the difficult dewatering of red sandstone and the protection of natural foundations. The successful completion of this project has significantly expanded the technical experience available for deep excavation engineering in Lanzhou and provides meaningful guidance for future projects in similar geological environments.

Key words: Pebble Soil Layer, Red Sandstone, Deep Excavation, Diaphragm Wall, Ring Support, Systematic Dewatering

中图分类号: