土工基础 ›› 2026, Vol. 40 ›› Issue (3): 432-436.

• 工程实录 • 上一篇    下一篇

某输电线路杆塔基础变形破坏原因及处治对策

张宏斌,胡 昕,樊柱军,刘志伟   

  1. (中国电力工程顾问集团西北电力设计院有限公司,西安 710075)
  • 收稿日期:2025-02-20 修回日期:2025-03-10 出版日期:2026-06-30 发布日期:2026-06-25
  • 作者简介:张宏斌(1999-),男,助理工程师,研究方向为岩土工程勘察设计。
  • 基金资助:
    中国能源建设股份有限公司重大科技项目(CEEC2021-ZDYF-18);中国能源建设集团规划设计有限公司科技项目(GSKJ2-G04-2021)

Reasons for Deformation and Failure of Tower Foundation of a Transmission Line and Treatment Countermeasures

ZHANG Hongbin, HU Xin, FAN Zhujun, LIU Zhiwei   

  • Received:2025-02-20 Revised:2025-03-10 Online:2026-06-30 Published:2026-06-25

摘要: 为评估某输电线路杆塔基础的变形破坏现状并提出处治对策,通过现场测量、调查、勘探和物探等方法开展杆塔塔基变形破坏的勘察工作,确定了塔基变形破坏的发育程度,分析了其形成原因,并结合变形破坏程度的影响因素,提出了应对杆塔基础变形破坏的处治措施建议。结果表明,该杆塔基础的变形破坏是在反复冻胀融沉作用下,由塔基所在坡体上覆的多年冻土沿着斜坡坡向向下发生蠕变滑动所导致,是多年冻土区由特殊土引发的工程地质问题,处治应对策略可选择改线避让措施或在原塔基采取抗冻胀及减少蠕变滑动的工程措施。


关键词: 多年冻土, 输电线路, 蠕变滑动, 冻胀融沉, 变形破坏, 处治对策

Abstract: To evaluate the deformation and failure of a transmission-line tower foundation and develop appropriate mitigation strategies, a comprehensive investigation was carried out using field measurements, surveys, subsurface explorations, and geophysical techniques. The study defined the extent of the foundation’s deformation, analyzed its underlying mechanisms, and identified the key contributing factors. Findings show that the deformation and failure resulted from creep-related sliding of the overlying permafrost in the slope direction, triggered by repeated freeze-thaw cycles. This represents a characteristic engineering-geological issue associated with special soil conditions in permafrost regions. Based on these results, two categories of countermeasures are recommended: rerouting the transmission line to avoid potential structural conflicts or implementing engineering treatments at the existing site to reduce frost heave and limit permafrost creep, thereby stabilizing the tower foundation.

Key words: Permafrost, Transmission Lines, Creep Slip, Freeze-Thaw and Thaw-Subsidence, Deformation and Failure, Treatment Countermeasures