土工基础 ›› 2026, Vol. 40 ›› Issue (3): 421-427.

• 工程实录 • 上一篇    下一篇

超大直径盾构穿越平行运营高铁桥基施工技术研究

葛照国   

  1. (中铁十四局集团大盾构工程有限公司,南京 211800)
  • 收稿日期:2024-05-10 修回日期:2024-06-27 出版日期:2026-06-30 发布日期:2026-06-25
  • 作者简介:葛照国(1982-),男,高级工程师,研究方向为隧道工程。
  • 基金资助:
    中铁十四局集团有限公司科研课题(202114jtky0087)

Construction Methods of Large Diameter Shield Structure Crossing Bridge Foundation of Parallel-Operated High-Speed Railway

GE Zhaoguo   

  1. (China Railway 14th Corporation Mega Shield Construction Engineering Co. Ltd., Nanjing 211800)
  • Received:2024-05-10 Revised:2024-06-27 Online:2026-06-30 Published:2026-06-25

摘要: 依托上海轨道交通市域线机场联络线工程,围绕软土地层超大直径盾构小净距并行运营高铁且下穿河流的安全控制难题,考虑未加固和注浆加固两种工况,采用有限元软件(MIDAS)分别建立了三维精细化模型,并结合现场监测,系统研究了软土地层超大直径盾构施工影响下既有结构变形和地层沉降规律。研究结果表明:快速注浆和浆液快速成型方法有效地控制了盾构隧道所在地层的竖向共同变形;隔离桩将盾构施工造成的地层变形阻断并隔离在桩布置区域内,有效地控制了并行高铁桥基的不均匀沉降和整体沉降。利用改变注浆浆液属性并快速注浆+超长距离、大面积隔离桩的地层处理专项施工方案对于本工程是合理且安全的。

关键词: 盾构工程, 小净距并行, 高铁桥基, 数值分析, 加固措施

Abstract: The control of ground settlement during shield-driven excavation has long been a critical technical challenge in tunnel engineering. This paper examines the Shanghai Rail Transit City Line Airport Liaison Line project as a case study. It focuses on the complexities associated with constructing an ultra-large-diameter shield tunnel in soft soil conditions, particularly where the alignment runs parallel to an operating high-speed railway with a very small clear distance and crosses beneath a river—conditions that impose stringent safety requirements. Two construction scenarios—unreinforced excavation and grouting-reinforced excavation—are evaluated. A refined three-dimensional numerical model is developed using the commercial finite-element platform MIDAS, and the simulation results are integrated with on-site monitoring data. This combined approach enables a systematic assessment of the deformation behavior of existing structures and the surrounding ground under the influence of the super-large-diameter shield excavation in soft strata. The findings indicate that rapid grouting and fast-setting slurry techniques effectively limit vertical deformation in the soil surrounding the shield tunnel. Additionally, the use of long-distance, large-area isolation piles significantly reduces soil disturbance within the pile zone, thereby controlling both differential and overall settlement of the high-speed railway bridge foundations. The specialized construction strategy—featuring tailored slurry properties, rapid grouting, and extensive isolation piling demonstrated to be both safe and appropriate for the project’s demanding conditions.

Key words: Shielded Excavation, Small Parallel Clearances, High Speed Rail Bridges, Numerical Analysis, Reinforcement Measures

中图分类号: