土工基础 ›› 2026, Vol. 40 ›› Issue (3): 387-392.

• 工程实录 •    下一篇

复杂环境下地铁大跨换乘通道暗挖风险控制关键技术

聂子云,谭小兵,朱占国,冯高飞,王正松,时 旦   

  1. (中国铁路设计集团有限公司,天津 110011)
  • 收稿日期:2024-05-09 修回日期:2024-06-11 出版日期:2026-06-30 发布日期:2026-06-25
  • 作者简介:聂子云(1987-),男,高级工程师,硕士,研究方向为地下结构工程。
  • 基金资助:
    中国铁路设计集团有限公司科技开发计划课题(编号 721799)

Key Methods for Risk Control of the Underground Excavation of a Large-Span Subway Transfer Gallery in Complex Environments

NIE Ziyun, TAN Xiaobing, ZHU Zhanguo, FENG Gaofei, WANG Zhengsong, SHI Dan   

  1. (China Railway Design Co. Ltd., Tianjin 110011)
  • Received:2024-05-09 Revised:2024-06-11 Online:2026-06-30 Published:2026-06-25

摘要: 沈阳地铁4号线太原街站位于繁华商业区,车站换乘通道跨度超过10 m,覆土最浅处仅4.5 m,通道与地上建筑、地下商业街和既有线车站、区间、出入口环绕交错,对其设计重难点进行了分析,提出了针对性技术措施,重点介绍了大跨暗挖环境风险控制、大跨暗挖通道直角转向设计、大跨暗挖通道与既有结构接驳开洞关键技术,采取地层加固、设置隔离桩等措施减少大跨暗挖对敏感环境的影响,采取暗挖侧向对接方案降低传统大跨暗挖直角转向施工风险,采取分部破除、分部构建环梁的措施提高既有侧墙大范围开洞接驳的安全,数值分析和监控量测结果验证了这些技术措施的有效性,相关经验可以为类似工程的设计与施工提供参考。


关键词: 复杂环境, 换乘通道, 大跨暗挖, 风险控制

Abstract: Taiyuan Street Station on Shenyang Metro Line No. 4 is located in a dense commercial district. The station’s transfer gallery spans more than 10 m, with a minimum soil cover of only 4.5 m. The construction area is tightly surrounded by surface buildings, underground shopping streets, existing metro stations, regional rail lines, and multiple entrances and exits. This paper examines the challenges posed by such a large-span underground excavation and proposes targeted engineering measures. It focuses on key techniques for environmental risk control, right-angle turning excavation, and large-scale openings in existing side walls. Measures such as soil reinforcement and isolation pile installation are implemented to minimize the impact of excavation on the sensitive surroundings. A lateral docking scheme is adopted to reduce the risks typically associated with right-angle steering in large-span underground works. Segmental ring-beam casting is used to enhance the safety of opening existing side walls. Numerical simulations and monitoring data confirm the effectiveness of these technical strategies. The experience gained provides valuable reference for similar future projects.

Key words: Complex Environment, Transfer Gallery, LargeSpan Underground Excavation, Risk Control

中图分类号: