土工基础 ›› 2025, Vol. 39 ›› Issue (6): 856-859.

• 工程实录 • 上一篇    下一篇

悬挂式止水帷幕深基坑降水影响因素分析

宁方帅1,2,师文豪1,2   

  1. (1.苏州科技大学 土木工程学院 岩土工程研究所,江苏苏州 215011;2.昆山市地下空间技术研究院有限公司,江苏苏州 215300)
  • 收稿日期:2023-12-01 修回日期:2024-01-09 出版日期:2025-12-31 发布日期:2026-01-31
  • 作者简介:宁方帅(1998-),男,硕士研究生,研究方向为岩土工程。

Analysis of Influencing Factors of Dewatering in Deep Excavation with Suspended Cutoff Wall

NING Fangshuai1,2, SHI Wenhao1,2   

  1. (1.Geotechnical Research Institute, School of Civil Engineering, Suzhou University of Science and Technology, Suzhou 215011;2.Kunshan Underground Space Technology Research Institute Co. Ltd., Suzhou 215300)
  • Received:2023-12-01 Revised:2024-01-09 Online:2025-12-31 Published:2026-01-31

摘要: 相对于落底式止水帷幕而言,悬挂式止水帷幕更易于在降水后产生更大的坑外地表变形,因此对悬挂式止水帷幕降水研究具有重要的工程意义。依托昆山城市广场基坑项目,利用GMS MODFLOW建立了三维降水模型,模拟了实际工程降水状况,并对降水速率、降水井布设方式及回灌速率对降水效果的影响进行了分析。结果表明:坑外水位在降深10 d后基本处于稳定状态,且在降水第1 d坑外水位大幅度变化;相同降水总量下,降水井布设方式对坑外水位影响基本一致;坑外水位降深随着降水井滤管插入深度增加而增加;回灌量与降水量保持在70%以上可保证坑外水位处于安全状态。

关键词: 深基坑, 悬挂式止水帷幕, 降水, 回灌

Abstract: Compared with the bottom type of cutoff walls, the suspended cutoff wall is more prone to produce larger surface deformation outside the excavation after dewatering, so it has an important engineering significance for the research. The case history of a deep excavation project of Kunshan City Square is presented in this paper. A 3D dewatering model was established by using GMS MODFLOW to simulate the actual project dewatering conditions. The influence of dewatering rate, dewatering well layout and recharge rate on the dewatering effect was analyzed. The results show that the water level outside the excavation is basically in a stable state after 10 days of depth reduction, and the water level outside the excavation changes greatly on the first day of dewatering. Under the same total amount of dewatering, the layout of dewatering well has the same effect on the water level outside the excavation. The drop depth of water level outside the excavation increases with the insertion depth of filter pipe. The water level outside the excavation can be kept in a safe state by keeping the recharge and dewatering amounts above 70%.

Key words: Deep Excavations, Suspended Cutoff Wall, Dewatering, Recharge

中图分类号: