紧邻防汛设施与历史建筑的基坑工程设计与实践

葛新鹏1,沈 健2,3,王惠生2,3   

  1. (1.上海广大基础工程有限公司,上海 200011;2.上海基坑工程环境安全控制工程技术研究中心,上海 200011;
    3.华东建筑设计研究院有限公司 上海地下空间与工程设计研究院,上海 200011)
  • 收稿日期:2023-06-12 修回日期:2023-06-25 出版日期:2025-06-30 发布日期:2025-08-05
  • 作者简介:葛新鹏(1989-),男,高级工程师,研究方向为地基基础与地下工程的施工。

Design and Practice of Deep Excavations Adjacent to Flood Control Facilities and Historic Buildings

GE Xinpeng1, SHEN Jian2,3, WANG Huisheng2,3   

  1. (1.Shanghai Guangda Foundation Engineering Co. Ltd., Shanghai 200011;
    2.Shanghai Engineering Research Center of Safety Control for Facilities Adjacent to Deep Excavations, Shanghai 200011;
    3.Shanghai Underground Space Engineering Design & Research Institute, East China Architecture Design & Research Institute Co. Ltd., Shanghai 200011)
  • Received:2023-06-12 Revised:2023-06-25 Online:2025-06-30 Published:2025-08-05

摘要: 上海某紧邻黄浦江建设的基坑工程周边邻近防汛墙、苏闸闸墩等极为重要的防汛设施,同时又邻近2幢优秀历史建筑,周边环境条件极为敏感,基坑变形控制要求极高。项目场地工程地质条件复杂,邻江地层土性较差且透水性较强,同时场地内还存在地下障碍物等诸多设计施工难点。为解决上述方面的问题,综合环境保护要求、工期及工程地质条件,基坑采用了顺逆结合的总体分区分期方案,并针对关键的敏感对象保护环节进行了支护结构措施的加强。通过实测数据可以证明,工程实施期间与基坑紧邻的黄浦江防汛设施、历史建筑等周边保护对象均处于安全可控的状态,所采取的一系列设计措施确保了周边环境的安全,达到了预期效果。


关键词: 防汛设施, 历史保护建筑, 顺逆结合

Abstract: A deep excavation project in Shanghai near the Huangpu River is adjacent to a flood control wall, the Su gate pier and other important flood control facilities. This project is also close to two other well-known historical buildings. Since the surrounding environmental conditions are extremely sensitive, the deep excavation deformation control requirements are extremely high. The project site engineering geological conditions are complex, and the soil of the adjacent river stratum is poor and permeable. There are also many design and construction difficulties such as underground obstructions. To solve the above-mentioned hazards, an overall zoning and staging option with a combination of bottom-up and top-down construction method was adopted for the deep excavation, and the support structure measures were strengthened for the key sensitive object protection links, to integrate the environmental protection requirements, the construction schedule and the engineering geological conditions. The measured data demonstrate that the surrounding protection objects such as the Huangpu River flood control facilities and historical buildings adjacent to the excavations are in a safe and controllable state during the excavation construction. The series of design measures implemented ensure the safety of the surrounding environment and achieve the expected effect.

Key words: Flood Control Facilities, Historic Buildings, Top-Down and Bottom-Up Combinations