土工基础 ›› 2023, Vol. 37 ›› Issue (3): 468-472.

• 专题论述 • 上一篇    下一篇

基于时空平滑的DPM数据分析新方法及其在地层识别中的应用

王 雄1,刘晓祥2   

  1. (1.云南交投集团投资有限公司,昆明 650000;2.云南交投集团公路建设有限公司,昆明 650000)
  • 收稿日期:2023-02-14 修回日期:2023-02-24 出版日期:2023-06-30 发布日期:2023-07-05
  • 作者简介:王雄(1986-),男,工程师,研究方向为公路工程管理。
  • 基金资助:
    云交科 [2020]749号

A New Method of DPM Data Analysis Using Spatiotemporal Smoothing and Its Application to Stratigraphic Identification

WANG Xiong1, LIU Xiaoxiang2   

  1. (1.Yunnan Communications Investment Group Investment Co. Ltd., Kunming 650000;
    2.Yunnan Communications Investment Group Highway Construction Co. Ltd., Kunming 650000)
  • Received:2023-02-14 Revised:2023-02-24 Online:2023-06-30 Published:2023-07-05

摘要: 准确识别地层性质对保证边坡的稳定至关重要,在一些限制条件下,可能未能进行取芯钻探勘察,致使对实际地层的划分因人而异,缺乏客观依据,岩体工程性质无法准确掌握,影响边坡的设计和稳定。随钻测试技术能获取钻孔过程本身携带的地层信息,但目前缺少可靠的数据分析方法。以DPM技术为基础,提出了新的随钻测试数据分析方法,通过在空间和时间尺度上对钻进速度进行平滑,解决了钻机动力参数随机波动的问题,并以云南省昆磨高速公路小勐养至磨憨段公路某挖方段边坡为例,全程监测了锚索孔的钻进过程,并对监测数据进行时空平滑分析,建立了钻进速度与岩性的关系,识别了地层,为边坡设计提供了可靠依据。

关键词: 风化岩, 失稳, DPM, 钻孔, 监测, 钻进速度

Abstract: The accurate identification of stratum properties is very important to ensure the stability of the slope engineering projects. Under some restrictive conditions, the design of the engineered slope may not be able to obtain the soil and rock samples during the investigation, resulting in the division of actual strata varies from different staff, which lack of an objective basis. The soil and rock engineering properties cannot be accurately characterized thus it could affect the design and construction of a stable slope. The testing while drilling method can capture the soil and rock information carried by the drilling process itself, there is a lack of reliable data analysis methods. By using the Drilling Process Monitoring (DPM) method, this paper proposes a new analytical method of test data during drilling process. By smoothing the space and time scale of the drilling speed, it solves the problem of the random fluctuation of the drilling machine dynamic parameters. This paper presents a case history of a cut slope section from Xiaomangyang to Mohan section in Kunmo Expressway in Yunnan Province. The drilling process of the ground anchor is monitored throughout the entire process, and the monitored data are analyzed smoothly in time and space. The relationship between the drilling penetration rate and lithology is established and the soil/rock strata are identified, which provides a reliable basis for the engineered slope design.

Key words: Weathered Rock, Instability, Drilling Process Monitoring (DPM), Drilling, Monitoring, Penetration Rate

中图分类号: