土工基础 ›› 2023, Vol. 37 ›› Issue (2): 197-200.

• 工程实录 • 上一篇    下一篇

新建铁路路基下穿既有公路桥梁安全影响分析

辛 建   

  1. (中国铁路设计集团有限公司,天津 300308)
  • 收稿日期:2022-09-03 修回日期:2022-09-09 出版日期:2023-04-30 发布日期:2023-04-19
  • 作者简介:辛建(1986-),男,硕士研究生,工程师,研究方向为岩土工程。

Analysis of Safety Impact of New Railway Subgrade Passes Through an Existing Highway Bridge

XIN Jian   

  1. (China Railway Design Group Co. Ltd., Tianjin 300308)
  • Received:2022-09-03 Revised:2022-09-09 Online:2023-04-30 Published:2023-04-19

摘要: 新建铁路路基以路堤形式下穿既有公路桥梁,针对路基对桥梁的安全影响,以某新建铁路工程下穿公路桥为工程背景,采用有限元软件Midas GTS 建立三维模型,对比分析了放坡、U型槽结构、桩板式U型槽结构三种方案,结果表明:U型槽结构方案风险控制效果及经济性较好,铁路路基施工及运营引起既有公路桥桥墩顶部横桥向附加水平变形最大值为2.863 mm,竖向附加沉降最大值为1.189 mm,顺桥向附加水平变形最大值为0.076 mm,满足相关规范对既有桥墩的变形位移限值的要求。并且铁路施工及运营时结合持续变形监测可保证既有公路桥梁的运营安全,对于类似新建铁路下穿既有公路桥项目具有一定的参考价值。

关键词: 铁路路基, 既有公路桥, 数值模拟, U 形槽结构

Abstract: The new railway subgrade passes through the existing highway bridge in the form of embankment. Aiming at the safety impact of the subgrade on the bridge, this paper presents a case history of a new railway project under passing the highway bridge and effect of the railway embankment on the bridge safety is evaluated. The three-dimensional numerical analysis model is established by using the finite element software Midas GTS. The three types of embankments, namely, slope at both sides, U-shaped structure, U-shaped structure and sheet pile, are compared and analyzed. The results show that the risk control effect and the economy of the U-shaped structure scheme are better. The maximum value of the additional horizontal deformation in the bridge direction is 2.863mm, the maximum value of the additional vertical settlement is 1.189mm, and the maximum value of the additional horizontal deformation in the direction of the bridge is 0.076mm, which meets the requirements of the relevant design codes for the deformation and displacement limits of the existing bridge piers. In addition, the combination of the continuous deformation monitoring during the railway construction and the operation can ensure the operation safety of the existing highway bridges.

Key words: Railway Subgrade, Existing Highway Bridge, Numerical Simulation, U-shaped Structure

中图分类号: