土工基础 ›› 2020, Vol. 34 ›› Issue (3): 269-272.

• 工程实录 • 上一篇    下一篇

豹子溪生态廊道景观风光带工程地质特征分析

邓青军,刘亚洲,朱帆济,王先登   

  1. (武汉市政工程设计研究院有限责任公司,武汉 430023)
  • 收稿日期:2019-07-08 修回日期:2019-07-17 出版日期:2020-06-20 发布日期:2020-06-20
  • 作者简介:邓青军(1987-),男,硕士,注册土木工程师(岩土),一级建造师(市政),研究方向为岩土工程。

Engineering Geology Characteristics of Baozi Creek Ecological Scenery Corridor

DENG Qingjun, LIU Yazhou, ZHU Fanji, WANG Xiandeng   

  1. (Wuhan Municipal Engineering Design and Research Institute Co. Ltd., Wuhan 430023)
  • Received:2019-07-08 Revised:2019-07-17 Online:2020-06-20 Published:2020-06-20

摘要: 随着城市大规模地下空间开发,人工弃土随意堆放引发的社会经济和环境问题越来越受到重视,对大规模弃土场所等区域进行生态治理及二次开发利用对提升城市形象、建设生态宜居城市有重要意义。以武汉豹子溪生态廊道景观风光带建设工程为例,通过现场勘探取样及调查分析场地原生地质环境特征,全面分析近年来场地内大规模堆填外来弃土造成区内原生地质环境受到强烈破坏的情况,系统梳理研究区内高填方堆填边坡稳定性、高填方地段地面沉降、水土环境以及对高填方段的改造和利用等工程地质问题,并提出了相关的建议措施。

Abstract: With the large-scale urban underground space development, the storage of the wasted soil from these developments has created a series of increased social economic and environmental concerns. It is of great significance to the ecological management, redevelopment of the waste soil storage sites and other areas to enhance the image, to convert them into an ecological friendly and sustainable development modern city. This paper presents a case history of the construction project of Wuhan Baozi Creek ecological scenery corridor. Based on the site exploration, sampling, evaluation and analysis of geological environment of the existing site, geological environmental aspects of the site were severely damaged by the large amount of waste soil storage. The engineering concerns were included: slope stability on the nonengineered high random fills; ground subsidence induced by the waste soil fills; hydrological and groundwater condition changes; engineering considerations on these random high waste soil fills. These concerns are discussed in the paper and recommendation of the redevelopment are also proposed.


Key words: Baozi Creek, Ecological Scenery Corridor, Manmade Fills, Engineering Geology

中图分类号: