›› 2019, Vol. 33 ›› Issue (2): 151-154.

• 工程实录 • 上一篇    下一篇

充填型岩溶覆盖层厚度对隧道突水突泥的影响研究

安文生 1,姬同旭 2   

  1. (1.贵州宏信创达工程检测咨询有限公司,贵阳 550025;2.贵州省交通规划勘察设计研究院股份有限公司,贵阳 550025)
  • 收稿日期:2018-06-21 修回日期:2018-06-28 出版日期:2019-04-20 发布日期:2019-04-22
  • 通讯作者: 姬同旭(1990-),男,工程师,硕士,研究方向为高速公路防灾减灾。
  • 作者简介:安文生(1986-),男,硕士,研究方向为岩土工程。

Impact of Overburden Thickness over Karstic Bedrock on the Groundwater and Mudflow Intrusion During Tunnel Excavation

AN Wensheng1, JI Tongxu2   

  1. (1.Guizhou Hongxin Chuangda Engineering Testing and Consulting Co. Ltd., Guiyang 550025;
    2.Guizhou Transportation Planning Investigation and Design Co. Inc., Guiyang 550025)
  • Received:2018-06-21 Revised:2018-06-28 Online:2019-04-20 Published:2019-04-22

摘要: 由于围岩本身处于自然平衡状态,但在外界因素扰动作用下,改变了围岩原有的应力分布和地下水流动状态,从而引起岩溶裂隙进一步扩张、扩展,形成具有一定宽度的地下水径流管道,诱发隧道突水突泥灾害的产生。结合工程实例,建立了防突岩层最小安全厚度的力学模型,并推导出其计算公式,最后利用有限差分模拟软件进行预测在不同的充填介质厚度影响下,岩溶隧道发生突水突泥的可能性,通过分析、预测,为隧道施工的安全进行提供可靠保障,避免在隧道施工过程中突水突泥灾害的发生。

关键词: 径流管道, 防突岩层, 有限差分软件, 突水突泥

Abstract: Under natural conditions, the karstic bedrock and soil system are generally stable. The human activities, however, disturbs the subtle balance and changes the original geostress and groundwater flow pattern. These changes might result in the development of rock fissures and trigger the geological hazards such as groundwater and mudflow intrusion during the tunnel excavations. This paper presents an approach of establishing a model that the minimum thickness of the bedrock layer that can avoid the groundwater and mudflow intrusion during the tunnel excavation based on practical engineering applications. Various thickness of different filling material during the tunnel excavation were numerically simulated in order to evaluate the possibility of the groundwater and mudflow intrusion of excavation in karstic environment. Throughout the analysis and prediction, a safe tunnel excavation can be warranted.

Key words: groundwater flow channel, imperious rock mass, finite differential method, groundwater and mudflow intrusion