摘要: 介绍了强夯及振冲两种施工工艺在沙特扎瓦尔港码头堆场吹填区地基加固的处理效果及适用性,并对两种工艺从不同工程目的、经济适用性、功效等方面进行了比较.

关键词: 地基加固, 强夯, 振冲

Abstract: Soil improvement was needed for the Ras Az Zawr port in Saudi Arabia.  Authors introduced two methods in the paper, including dynamic compaction and vibrating blunt.  Improvement effects, applicability, purposes, cost were also compared and concluded.