摘要: 通过厦蓉高速贵州境内水格段某标段红粘土高边坡锚索框架梁施工,介绍了预应力锚索施工各个工序的技术性要求及施工注意事项;通过锚索的试验和监测,进一步论述了锚索框架梁在高边坡防护中所起到的加固作用,在一定程度上节约了成本,具有良好的经济效益和社会效益。
关键词: 红粘土, 高边坡, 预应力锚索
Abstract: The procedures and technical details of pre\|stressed ground anchor installations are presented throughout a case history in a red clay soil cut slope construction located in a section of the Shuige, Guizhou Prov. of the Xiamen\|Chengdu Expressway Project. The pre\|stressed ground anchors along with the reinforced concrete anchor frames were tested and monitored in the project. A cost saving was achieved compared with other slope stability methods.
Key words: red clay soils, high cut slope, pre\, stressed ground anchors
张 青1, 牟春梅1, 李旺兴2. 预应力锚索在红粘土高边坡中的应用[J]. , 2011, 25(6): 11-.
ZHANG Qing1, MOU Chun mei1, LI Wang xing2. Application of Pre\|stressed Ground Anchors in High Cut Slopes in Red Clay Soils[J]. , 2011, 25(6): 11-.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: https://tgjc.whrsm.ac.cn/CN/
https://tgjc.whrsm.ac.cn/CN/Y2011/V25/I6/11