›› 2011, Vol. 25 ›› Issue (5): 79-81.

• 工程实录 • 上一篇    下一篇

超孔隙水压力监测在大夯击能强夯中的成果分析

武玉龙   

  1. (辽宁省有色地质局105队,辽宁葫芦岛 125000)
  • 收稿日期:2011-01-07 出版日期:2011-10-20 发布日期:2011-11-23
  • 作者简介:武玉龙,男,1971年生,吉林扶余人,高级工程师,全国注册土木工程师(岩土)。

Analyses of Excessive Pore Water Pressure in High Energy Dynamic Compaction

WU  Yu  long     

  1. (Liaoning Provincial Bureau of Nonferrous Geological Investigation Team 105, Huludao Liaoning 125000, China)
  • Received:2011-01-07 Online:2011-10-20 Published:2011-11-23

摘要: 分析强夯最佳夯击能以及强夯间歇时间的确定方法,并讨论超孔隙水压力在大夯击能强夯中的变化情况。工程应用结果表明,强夯工程影响深度约为11.0 m,强夯有效加固深度为9.0 m。

关键词: 超孔隙水压力, 最佳夯击能, 强夯间隔时间 

Abstract: Through a case study, the dissipation of excessive pore water pressure during the high energy dynamic compaction process is evaluated. The dynamic compaction energy and the time interval between two compaction passes is optimized with respect to maximizing the soil improvement achieved. In this case study, the influence depth of the high energy dynamic compaction is determined to be approximately 11 meters and the effective improvement depth is determined to be 9 meters.