Application of Combining with PBA Method and the Top-Down Bored -Excavation with Cast-in-Situ Arch for the Underground Construction
HUANG Xiaofang, JIA Zhixuan, ZHANG Nian
Soil Engineering and Foundation . 2017, (2): 154 -156 .