›› 2014, Vol. 28 ›› Issue (5): 44-46.

Previous Articles     Next Articles

Quality Control on the Deep Seepage Cutoff Walls for Strengthened Coastal Soils

LIU Yingjun   

  1. (Shenzhen Metro Co., LTD, Shenzhen, 518026)
  • Received:2013-11-29 Online:2014-10-20 Published:2014-10-28

Abstract: This paper presents the deep excavation results for the Line No. 5 of Shenzhen Metro. The failure of the seepage cutoff wall is systematically analyzed through different aspects: engineering geology, construction procedures, equipment and construction quality control. The effects of different factors on the seepage cutoff wall are discussed and the mitigation measure is also proposed.

Key words: Deep Excavations, Seepage Cutoff Walls, Quality Controls, Effect Factors