Analysis the Post Construction Settlement of a Metro Tunnel

CHEN Xing   

  1. (China Railway Siyuan Group Southwest Survey and Design Co., Ltd, Kunming, 650200)
  • Received:2013-10-24 Online:2014-06-20 Published:2014-08-20

Abstract: In the metro construction practice, it is often required to predict the post construction settlement magnitude during the construction. A stable post construction settlement is critical for the scheduling of the equipment installation and others. Three methods are often used: theoretical method; empirical method; and numerical analysis method. This paper presents the results of all three methods. A decision of whether a stable post construction settlement can be obtained was made based on three settlement prediction results.

Key words: Metro Tunnel, Post Construction Settlement, Theoretical Method, Empirical Method, Numerical Analysis