Approaches of Groundwater Control for Deep Excavations

ZHANG Hongbo1, CHEN Sheng2, LU Weidong3   

  1. (1.CCCC Second Harbor Engineering Company, Ltd. Wuhan  430040;2.CCCC Second Harbor 1st Engineering Company, Ltd. Wuhan  430040;3.Wuhan Zhongli Geotechnical Engineering Co., Ltd.  Wuhan 430071)
  • Received:2012-02-09 Online:2012-06-20 Published:2012-06-25

Abstract: This paper introduces several dewatering methods for the deep excavations with different hydrological and construction conditions.

Key words: Deep excavation, Groundwater, Coefficient of Permeability, Dewatering Engineering