Prestressed Concrete Pipe Pile Supported Embankment over Thick Soft Soils in Panyu

HE Xiaolin, HE Lihong, FAN Wei   

  1. (Wuhan Municipal Engineering Design and Research Institute Co. Ltd, Wuhan 430015)
  • Received:2012-03-13 Online:2012-06-20 Published:2012-06-25
  • Supported by:

    何小林(1974-),男,本科,工程师,研究方向为地下结构及岩土工程方面的设计和研究。

Abstract: This paper introduces the application of prestressed concrete pipe pile supported embankment over thick soft muck and mucky soils during the construction of Huanglan (west section) expressway. The pile installation started in February 2010 and completed in August 2010. The embankment construction was completed in January 2011. The settlement monitoring results indicated that the maximum post construction settlement was 220 mm. This settlement value is consistent with the predicted value during the design stage.